New windward and downwind dock construction, new dock walls, port basin dredging and construction of connection road in the port of the borderline island of Ereikoussa, to the North of Corfu island. Windward dock protection with tetrapods and natural big stones. Delivery in a record time, at 1/3 of the initial milestone.