MARINA IN ASTROS, ARCADIA 2014

  • Reconstruction of 90 m long quay wall with bored piles D 100
  • Downwind dock extension for 35 m. Channel dredging.
  • Coastal pier 85 m long with hoist ramp
  • Basin dredging at -4,50 m depth.
  • Floating docks (pontoons) 190 m long.